My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 2:10:05 PM
Creation date
6/23/2020 6:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i_71 <br /> Site Address: '2130,.7906 N EL DORADO11P3TOCKTON,CA 95210 <br /> F. Ih-Tank Gauging/SIR Equipment: jeckthis box if tank gauging is used only for inventory control. <br /> g <br /> Check this box if no tonic gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gau&W equipment is used to perform leak detection monitoring. <br /> Complete the ren�o Ing checklist- <br /> yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes M No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes Was accuracy of system product level readings tested? <br /> Yes—, 0 Was accuracy of system water levelreadings tested? <br /> Yes _ajN_o* Were all probes reinstalled properly? <br /> M:Yes— U-14o* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe kow and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): r6heck this box if LLDs are not installed. <br /> con"the fens checklist: <br /> MI?as No*' Far equipment startrup or annual equipment SpetIcation, was a leak simulated to verify LLD performance? <br /> MIA (Check all that apply) Simulated leak rate: Iff; g.ph.1; 5,0.1 g.ph.2; M-0,2 g.p.h,2 <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD stert.up. <br /> No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> No* I Was the testing apparatus properly cahbrated? <br /> to Nz*�O For mechanical LLD9,does the LLD restrict product flow if it detects a leak? <br /> NIA <br /> FyesY lee I No* For electronic UDs,does the turbine automatically shut off if the UM detects a leak?. <br /> NIA <br /> O'Yes No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> O'Yes No* For electronic LLDP, does the turbine automatically shut off if any portion of the monitoring system mah%nctions <br /> NIA or fails atest? <br /> KYes NO* For electronic LLDs,have all accessible wining connections been visually inspected? <br /> NIA <br /> GrYes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when tivese deficle;;n:—s were or In corrected. <br /> IL comments: <br /> Page 3 of 3 03MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.