Laserfiche WebLink
SWRCB,January 2002 D-7-o Y Page of ;2- <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facili is Not Equi22Sd With S ill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Sta Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum y static <br /> Other(Specify) <br /> Test Equipment Used: V V.4,L Equipment Resolution: <br /> Spill Box# Spill Boz# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: I J <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: /0^1 jj z o /CA /or <br /> Test Start Time: <l —7,--?T 34' 9r3 Q 4;:S? 9,3 <br /> Initial Reading(Rj): r <br /> Test End Time: v 0 34 /013r <br /> Final Reading(RF): P— k� <br /> Test Duration: 2 i ,c/x .2#A Iffi� fY•c f�2 .� �fln <br /> Change in Reading(RF-R'): <br /> Pass/Fail Threshold or <br /> Criteria- <br /> TestResult: <br /> 4f 87 SX-niac, Y75pk-- P sp1� �7 7.ws <br /> F# F, 1! - <br /> Comments—(include information on re airs made rior to testing,an recom en e o - az tests <br /> 4 <br /> h <br /> N <br />