Laserfiche WebLink
vo <br /> Site Address: SS#2130,7906 N. EL DORADO STREET,STOCKTON Date of Testing/Servicing: <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> . . . . . . . . . . : : : : : : : : . . . . . . . . . . . . . . . . . . . . . . <br /> ✓rte y <br /> . . . . . . <br /> . . . . . . . . . 7. . . . . . . . . . . . . . . . . . . . . . . . . <br /> ,r. <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . 1 . <br /> . . . . . . . . . . . . . �\ Sia , . . . . . <br /> ' : . . <br /> Date map was drawn, <br /> Instructions <br /> If you already have a diagram that shows all required infonnation, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page of 05/00 <br />