Laserfiche WebLink
3. Piping Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ®Sump leak sensors connected to Veeder Root 794380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> ❑ Discriminating <br /> ® <br /> Non-discriminating <br /> Mechanical line leak detectors with <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> ®Electronic line leak detectors with Red Jacket CPT <br /> programmed leak threshold of: Every pumping cycle <br /> ❑0.1 gph ❑0.2 gph 03 gph <br /> ❑ Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑Other: <br /> ❑Third party testing <br /> ® Not required <br /> ❑Other(Specify): <br /> 4. Dispenser Leak Detection Monitorin Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ❑Mechanical float in dispenser Continuous <br /> containment <br /> Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: Continuous <br /> ❑ Discriminating <br /> ® <br /> Non-discriminating <br /> F1 Visual inspection Visual inspection log maintained on site. ❑ Daily <br /> Other: <br /> ❑ No under-dispenser containment <br /> ❑Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> ❑System does not have positive shutdown capabilities <br /> ❑ Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> Automatic pump shut off will occur whenever: <br /> ® Release is sensed in turbine sump <br /> ® Release is sensed in primary piping <br /> ® Release is sensed at dispenser <br /> ®Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑Other(specify): <br /> 6.Secondary Containment Testis <br /> Secondary containment is not tested <br /> gin the State of Califomia,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment Certifi"ication/Testin <br /> ®Annually <br /> ❑Other(specify): <br /> 2 <br />