My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 2:10:05 PM
Creation date
6/23/2020 6:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z. Piping Leak Detection Monitoring Equipment <br /> )nItorIng Method Manufacturer Model Monitoring Fre uenc <br /> Sump leak sensors connected to Veeder Root 784380-208 <br /> continuous monitoring system <br /> Secify type: Continuous <br /> [�Discriminating <br /> ® <br /> Non-discriminating <br /> Mechanical line leak detectors with <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> Electronic line leak detectors with Red Jacket CPT <br /> rogrammed leak threshold of: Every pumping cycle <br /> Ij 0.1 gph 0.2 gph ®3 Aph <br /> Ll tine integrity testing by: <br /> ❑Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑Other: <br /> ❑Third party testing <br /> Not r uired <br /> ❑Other(Specify): <br /> 4. Dispenser Leak Detection Monitoring Equipment <br /> Monitorlpq Method I Manufacturer Model Monitodng Frequency <br /> Mechanical float in dispenser Continuous <br /> containment <br /> Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: <br /> ❑Discriminating Continuous <br /> Non-discriminatin <br /> Visual inspection Visual inspection log maintained on site. Daily <br /> ❑Other: <br /> No under-dispenser containment <br /> ❑Other(specify):Mechanical Float activates shear valve when leak detected. <br /> 6. Positive Shutdown Capabilities <br /> System does not have p2sitive shutdown capabilities <br /> Individual dispenser shutdown will occur whenever release is sensed in urider-disp2nser containment <br /> Automatic pump shut off will occur whenever. <br /> ®Release is sensed in turbine sump <br /> ®Release is sensed in primary piping <br /> ®Release is sensed at dispenser <br /> ®Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑Other(specify): <br /> 6.Secondary Containment Testing <br /> Secondary containment is not tested <br /> In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment Certification/Testin <br /> Annual) <br /> ❑Other(specify): <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.