Laserfiche WebLink
z. Piping Leak Detection Monitoring Equipment <br /> )nItorIng Method Manufacturer Model Monitoring Fre uenc <br /> Sump leak sensors connected to Veeder Root 784380-208 <br /> continuous monitoring system <br /> Secify type: Continuous <br /> [�Discriminating <br /> ® <br /> Non-discriminating <br /> Mechanical line leak detectors with <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> Electronic line leak detectors with Red Jacket CPT <br /> rogrammed leak threshold of: Every pumping cycle <br /> Ij 0.1 gph 0.2 gph ®3 Aph <br /> Ll tine integrity testing by: <br /> ❑Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑Other: <br /> ❑Third party testing <br /> Not r uired <br /> ❑Other(Specify): <br /> 4. Dispenser Leak Detection Monitoring Equipment <br /> Monitorlpq Method I Manufacturer Model Monitodng Frequency <br /> Mechanical float in dispenser Continuous <br /> containment <br /> Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: <br /> ❑Discriminating Continuous <br /> Non-discriminatin <br /> Visual inspection Visual inspection log maintained on site. Daily <br /> ❑Other: <br /> No under-dispenser containment <br /> ❑Other(specify):Mechanical Float activates shear valve when leak detected. <br /> 6. Positive Shutdown Capabilities <br /> System does not have p2sitive shutdown capabilities <br /> Individual dispenser shutdown will occur whenever release is sensed in urider-disp2nser containment <br /> Automatic pump shut off will occur whenever. <br /> ®Release is sensed in turbine sump <br /> ®Release is sensed in primary piping <br /> ®Release is sensed at dispenser <br /> ®Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑Other(specify): <br /> 6.Secondary Containment Testing <br /> Secondary containment is not tested <br /> In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment Certification/Testin <br /> Annual) <br /> ❑Other(specify): <br /> 2 <br />