Laserfiche WebLink
`EDGE Of 1RENCH <br />21 2' FIBERGLASS PRIMARY PIPE (TVP.) <br />2. THE VAPOR RECOVERY SHEAR VALVE SHALL DE A TOP ENTRY VALVE. <br />SEE SECTION D ON THIS SHEET <br />Ip J' FIBERGLASS SECONDARY PIPE (TYP.) <br />C B <br />3' FIBERGLASS TEE AND TK3-3 TK3-3 <br />3' FIBERGLASS 45' ELL (TYP.) <br />(SECONDARY) <br />3. ALL SHEAR VALVES SHALL BE SECURELY MOUNTED TO THE STABILIZER <br />BAR ASSEMBLY TO ASSURE VALVES WILL TRIP AND OR SHEAR UPON AN IMPACT <br />OF DESIGN CONDITIONS. <br />t. ALL UNDER DISPENSER CONTAINMENT SUMPS ARE P CONDUIT EN WITH THE EXCEPTION <br />OF THE VAPOR RECOVERY ENTRY AND ELECTRICAL CONDUIT ENTRIES. <br />H <br />Plan View Detail <br />Product MPD Piping <br />A Section Shear Valve Section <br />(D,T,.nhree <br />NOT TO SCALE. <br />T TO SCALE: <br />*8' SIDE OF <br />DISPENSER <br />((I IQ IMPACT SECTION VALV B/ UNIOFLUSN TOP <br />W/ TOP OF PUMP ISLAND) <br />GASOLINE RESISTANT SEALANT <br />AROUND BASE OF DISPENSER <br />TOP OF CONCRETE DRIVE SLAB G • , A , <br />4. <br />E <br />21 <br />CONTAINMENT PIPE CLAMP ESMP. <br />3' SECONDARY J6 BIRXHEAO (FITTING <br />20 CONTAINMENT PIPE <br />O2' SLEEVE COUPLING WITH J <br />$ 1-1/Y R SLICER BUSHING <br />(PRIMARY PIPING <br />I1 J12' TEST REDUCER <br />NOTE: <br />UNDER DISPENSER CONTAINMENT SWV.L BE EOUIPPED WITH A POSITIVE SHUTDOWN <br />ELECTRONIC SENSOR THAT WILL INTERRUPT POWER TO THE DISPENSER. <br />NOTE: ANY STEEL PIPE k FITTINGS <br />TO HAVE MIN. 20 MIL WRAP <br />DISPENSER <br />JS CONTROL <br />INTERFACE <br />SEAL OFF <br />NOTE: SEE TK4-3 FOR <br />MATERIAL LIST <br />W TOOK OVERLAP ON TO <br />f RGLASS PIPE FITTRIGS <br />VAPOR RECOVERY NOT SHOWN THIS VIEW <br />Typical Under Dispenser <br />Containment Sump <br />12 NOT TO SCALE: <br />'A' SIDE OF <br />DISPENSER <br />DISPENSER <br />JUNCTION BOX <br />MATASER T 26 <br />SPLASH GUARD <br />/- 6' RAISED IFULL RADIUS DISPENSER ISLAND 39 <br />/ SEE DETAIL /15 ON TK3-4 <br />NIPPLE <br />COUPLING <br />32 1-1/2'.24' FLEX CONN. ,-3/4'C. DISPENSER POWER <br />AND COMMUNICATION TO <br />BLDG. <br />-3/4'C. VEEDER ROOT MONITORING <br />COMMUNICATION CABLE <br />ROUTED TO BLDG. <br />m INTERCOM <br />34 UNDER DISPENSER CONTAINMENT <br />SUMP. SIZE TO MATCH <br />DISPENSER FOOTPRINT. <br />DISPENSER MONITORING <br />J PROSE. MOUNTING <br />OF PROBE NOT SHOWN. <br />NOTE: <br />ALL FITTINGS IN UNDER DISPENSER CONTAINMENT SUMP <br />ARE PRE-INSTALLED EXCEPT FOR VAPOR k ELECTRICAL <br />PENETRATIONS. ELECTRICAL PENETRATIONS ENTER <br />FROM THE 'A' SIDE OF THE DISPENSER. PRODUCT <br />AND VAPOR RECOVERY PENETRATIONS ARE LOCATED <br />ON THE 'e' SIDE OF THE DISPENSER. <br />