Laserfiche WebLink
VSFC Site Installation Examples Installing a Pressure Transducer and an LS. Barrier in the STP <br />DID Installing a Pressure Transducer and an I.S. Barrier in the STP <br />For installations in which the Pressure Transducer and pump control wiring share the same conduit to the VSFC <br />unit, a Veeder-Root Intrinsically Safe Barrier must be installed in the STP and be connected to the Pressure <br />Transducer. These connections are discussed in the procedure below: <br />1. Reference Figure 6 and Figure 8 for installation examples. <br />2. Install Pressure Transducer (P/N 848480-001) as instructed in PLLD Transducer Installation Manual (P/N <br />576013-902) for the appropriate STP. <br />3. Remove the two contractor box covers (see Figure 6 or Figure 8) for cover locations on each style pump). <br />4. Inspect port's threads and hand clean with a wire brush if necessary. <br />5. Lubricate the o -ring of the I.S. barrier with petroleum jelly. <br />DO NOT APPLY ANY THREAD SEALANT OR PIPE DOPE TO THE THREADS <br />OF THE I.S. BARRIER OR TO THE THREADS OF THE STP'S CONTRACTOR <br />o I BOX INTO WHICH IT IS INSTALLED. <br />The metal -to -metal joint created by threads of the I.S. Barrier in the STP's <br />contractor's box ensures a restricted flame path to prevent propagation of a <br />spark or flame to a hazardous area. If any thread sealant or pipe dope is <br />applied to the threads of the I.S. Barrier or to the threads of the contrator's <br />box, the flame path may not be restricted, potentially resulting in serious <br />injury or death from explosion. <br />6. Install the I.S. Barrier (P/N 332101-001). Do not use thread sealant. Torque the I.S. Barrier to 35 ft -lbs (50 <br />N -m). <br />7. Pull the three wire cable (P/N 780-916-1) from the VSFC Master Unit into the STP's contractor box. In The <br />Red Jacket VSFC pumps, the compression bushing (P/N 410301-001) and tubing kit (P/N 410370-001) is <br />required with this cable. <br />B. Connect the black, white, and green wires in the bottom of the I.S. Barrier to the black (-) red (+), and blue <br />(ground) wires in the VSFC cable using wire nuts as shown in Figure 16. Use a wire nut to connect the <br />cable's drain wire to the grounding wire attached to contractor's box. <br />V -R 3 -conductor <br />shielded cable <br />(P/N 780-916-1) <br />To VSFC Master Unit <br />i <br />Seal -off <br />It F <br />f� <br />Rigid conduit <br />Wire nuts (typ.) <br />— (BLIP ® Black <br />Ground (BLU) ® Green <br />+ (RED) ®White <br />Drain - <br />Ground <br />Contractors box <br />Figure 16. I.S. Barrier field wiring connections <br />9. Install and torque the contractor's box cover to 35 ft -lbs (50 N -m). <br />26 <br />From <br />I.S. Barrier <br />redjacket/vsfc19.eps <br />