Laserfiche WebLink
y 1 SWRCB, January 2002 Page <br />('nNTAYNM .NT (ITDO TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engmeei T <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: ELLDS Equipment Resolution: .0007 <br />UD.0 # 1 - Z <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />RA <br />UDC Material: <br />UDC Depth: <br />a `` <br />` <br />Height from UDC Bottom to Top <br />of Highest Pi in Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration; <br />Condition of UDC prior to <br />4, X <br />testing: <br />Portion of UDC Testedl� <br />2" above highest <br />2" above highest <br />2" above highest <br />2" above highest <br />penetration <br />enetration <br />penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />_penetration <br />- <br />❑ Yes ❑ No LAIN <br />D Yes ❑ No [�A <br />❑ Yes ❑ No elgA' <br />❑ Yes ❑ No [INA <br />product and water)?' <br />Turbine shutdown response time <br />_ <br />N/A _ <br />N/A <br />N/A <br />_ N/A <br />is system programmed for fail- <br />❑ yes ❑ No KA <br />❑ Yes D No CjiA <br />❑ Yes D No !A <br />D Yes ❑ No DNA <br />safe shutdown?'Was <br />fail- safe verified to be <br />❑ Yes ❑ No [3°1�tA <br />❑ Yes ❑ No G?A <br />❑ Yes ❑ No WA <br />D Yes ❑ No ❑ NA <br />operational?` <br />Wait time between applying <br />pressure/vacuum/water and <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />starting test <br />Test Start Time: <br />401 00: <br />