Laserfiche WebLink
0 V 0 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />JCepjc.Ce 0120 L(�ILJ JL c Abe t <br />.%tai"b he SPcc-d or) 60-01 i cstl/"iS Cinj o0e <br />ti,ibrIStLte&_-Jc,r KOj-f Pe -t -L7 <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />33co.eo <br />-33o37y-c)c)-SPhye d 3 C",vtP,✓f VL L!3 (-o,)Tr- oI fr)occ)e <br />3So,Fy3 -ccj--Si1-4re - ty) iC 6 2 a r PLi_ � <br />2 <br />