My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 1:39:29 PM
Creation date
6/23/2020 6:42:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />This manual contains procedures for the installation or replacement of the Red Jacket Variable Speed Flow <br />Controller (VSFC). This manual assumes all preliminary site preparation is completed, and that field wiring from the <br />pumps to the VSFC is in place. <br />Reference Manuals - As Required <br />The Red Jacket STP Installation, Service, Parts Manual - P/N 577013-830 <br />• Quantum 4" STP Installation, Operation, & Service Manual - P/N 042-129-1 <br />• 4" STP and AG Pump Installation, Operation, & Service Manual - P/N 042-153-1 <br />• PLLD (Pressurized Line Leak Detection) Site Prep and Installation Guide - P/N 576013-902 <br />• FXV Leak Detectors Installation Instructions - P/N D042-106-1 <br />Contractor Certification Requirements <br />Veeder-Root requires the following minimum training certifications for contractors who will install and setup the <br />equipment discussed in this manual: <br />Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and conduit routing, <br />equipment mounting, probe and sensor installation, tank and line preparation, and line leak detector installation. <br />Level 2/3 Contractors holding valid Level 2 or 3 Certifications are approved to perform installation checkout, <br />startup, programming and operations training, troubleshooting and servicing for all Veeder-Root Tank Monitoring <br />Systems, including Line Leak Detection and associated accessories. <br />Warranty Registrations may only be submitted by selected distributors. <br />Required Installation kits <br />Table 1 illustrates the required kits and STP check valves for VSFC operation, by Red Jacket pump type. <br />Table 1: PLLD Required Kits <br />Additional Parts for Manifolded Pumps <br />Check Relief Valve <br />Single Tank w/ 2 STPs <br />2 or More Tanks w/ STP in each <br />Pump Type <br />PLLD Kit P/N <br />Red Jacket <br />848480-003 <br />SwiftCheck (in PLLD kit) <br />Non -vented SwiftCheck valve <br />Non -vented SwiftCheck valve for <br />Standard <br />for slave pump. Kit P/N <br />each slave pump. Kit P/N 330020- <br />330020-416 and interlock relay <br />416 <br />Red Jacket <br />848480-001 <br />Red Jacket Spike Check <br />Quantum <br />(factory installed) <br />848480-001 <br />Factory installed check/ <br />High pressure relief check valve, <br />High pressure relief check valve, P/N <br />The Red Jacket <br />relief valve <br />P/N 410153-002 and interlock <br />410153-002 <br />Pump <br />relay <br />
The URL can be used to link to this page
Your browser does not support the video tag.