Laserfiche WebLink
Apr 2417 02:30p P.10 <br /> 04/18/2017 21:32 9169 73 ARCADISO PAGE 04 <br /> Par—of <br /> 5. SECONDARY PIPENG <br /> so - <br /> Testi mthd Developed By.- C Piping Manufacturer Industry Standaid Professional Engineer <br /> C3 Other(Spec*) <br /> Text M*Th4Dd Used: are 0 vacuum El Hydrostatic <br /> [I Other 1pecify) <br /> Test Equipo" Used:Freaure gauge,stop we" Equipment Pgsoluti9n: 1.0 <br /> Piping Run#super Pipbxg Runftegular Pipft Run hegular W11119 978yphom <br /> Piping <br /> ng M <br /> o <br /> cnal. <br /> fiberglass fiberglass fibeqWs;iping Manufacturer: A G.Smith A.O.Srnilh A.O.Snith A.0.SWth <br /> Piping Djameto. <br /> 3.5" 3.5' 351 35, <br /> Length of Piping RM. I Ify 110, Ito 20' <br /> Product Stoted: gasoline gasoline gascilint gasoline <br /> Method and location of test bout test boot test boot test boot <br /> in -roan isolation: <br /> Wait tilm between applying <br /> pTZqwdvacuuwdwater and I 5mins Smins 5mins <br /> iqwng tesr. <br /> t6t'Start Time: 05-15 05:15 05:15 <br /> JaWW Re4ding(RI); 5FW, 5psi 5psi <br /> TcstEnd Thne: 06, 06:15 06.15 <br /> Final Reoding(RF). 5psi 5psi 5psi <br /> Te.-RI Duration: 50min" bOmins s <br /> Change in Reading(RrR 1): Dpsi Opsi opsi <br /> P, ail Threshold or Dpsi/60mins 0psi/60fTd= W60mins <br /> Criteria: <br /> rest Reswt: 11-pam 01Fav .0 'NM Clian Saw .0gat": <br /> comments— r& <br /> port Mdd#prior le te;cing,and reconunendedfatiow-upfor La diesa) <br /> RE' L JEST BOOT T SUPER SECOND TP SUME <br /> N6te: meth i iso la 'on co Wd liat be ed d odhe fact the <br /> smi2er test boot inside-dimenserfl-2 has been mUd gpj of its IM hauling, Pip-We <br /> ws the dispeum have iust been replaod this must have happen when <br /> i tall was_bgjngQQnducted. NQ jM1 QN SUPER LINE AT THIS 12ME. <br /> xf r"m D <br /> APR 2 4 Z07 <br /> DEALTH <br /> -PAPTNARNT <br /> b:, <br />