My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 8:38:01 AM
Creation date
6/23/2020 6:42:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_1986-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: Top . ADDRESS: 99 85 <br />FACILITY ID# TANK# UL#"" TANK'MODEL/MATERIAL: �Z <br />CAPACITY: '� , d O ® PRODUCT: R.E.H.S: <br />INITIAL INSPECTIONS <br />J� a 2� <br />J <br />A <br />I <br />VACUUM: SOAP: PSI: MRS/MIN: I (L'QUID ANN AR): 0TH tR: <br />(CCR <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION T - e ,_ p (CCR 2643 (c) (1)) <br />P <br />R <br />0 <br />I <br />T <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS -- -- - <br />2636 <br />V <br />E <br />Ap <br />L <br />8. <br />0 <br />S <br />2635 <br />(a) (4)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />PEI <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />ra® <br />"C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />10. <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />(CCR <br />2635 <br />(b) (1) (C)) <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />J� a 2� <br />J <br />✓ <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: +' HOLIDAY: g <br />VACUUM: SOAP: PSI: MRS/MIN: I (L'QUID ANN AR): 0TH tR: <br />(CCR <br />2636 <br />PRIMARY TANK TEST:PSI: HRS/MIN: o <br />w <br />13 " <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION T - e ,_ p (CCR 2643 (c) (1)) <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />1 ai.. jq <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) ; <br />(CCR <br />2636 <br />(e)) <br />13 " <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION T - e ,_ p (CCR 2643 (c) (1)) <br />J afd % <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: <br />OTHER: (CCR <br />2636 <br />(e)) <br />17 . BALL FLOAT VALVES INSTALLED <br />8. <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: <br />(CCR <br />2635 <br />(a) (4)) <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />ra® <br />"C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />!124. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCA <br />2636 <br />(b)) <br />12. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2636 <br />(c)(1)) <br />FINAL INSPECTION <br />1 ai.. jq <br />PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br />4. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION T - e ,_ p (CCR 2643 (c) (1)) <br />J afd % <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br />17 . BALL FLOAT VALVES INSTALLED <br />OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />020. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />TANK INTEGRITY TEST (PASSING HARD COPY) S f (CCR 2635 (a) (5)) <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />ra® <br />"C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />%a_MONITORING <br />6 <br />METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />!124. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br />COMMENTS: <br />EH23-006 7/97 <br />10 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.