My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 8:38:01 AM
Creation date
6/23/2020 6:42:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_1986-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br />ENGINEERING, INC. <br />4 <br />03 Sep 97 <br />via Fax and US Mail <br />Ms. Letitia Briggs <br />Environmental Health Services <br />Public Health Services <br />San Joaquin County <br />P.O. Box 388 <br />Stockton, CA 95201-0388 <br />QUIK STOP MARKET #39 - APN 141-214-03 <br />2285 E. Fremont Street, Stockton, CA 95205 <br />RE: UPGRADE EXISTING PETROLEUM SYSTEM <br />Dear Ms. Briggs: <br />As we discussed, I am writing to inform you of the status of this project's <br />execution. <br />I have been in contact with Mr. David Kwong of the City of Stockton's <br />Community Development Center, Planning Division, regarding required Planning <br />approvals for this project. He suggested that I write to the Director of <br />Planning, which I did on 07 Aug 97, including with that letter our proposed <br />layout for the new petroleum system (copy enclosed). <br />Subsequently, Mr. Kwong and I have discussed Planning and Public Works' <br />concerns. Today he faxed me a Public Works' suggested reconfiguration of <br />our proposal. <br />Had that revised layout been fully workable, we would now know the final <br />configuration of the remodeled site. I would then be able to revise our <br />drawings, request bids and choose a Contractor for the work. This would <br />have allowed me to provide the Contractor information missing from our <br />application for UST removal, as well as apply for an Authority to Construct <br />the new USTs and fueling system for the site. <br />Unfortunately, after initial review, that revised layout, at least in my opinion, <br />requires some refinement as I see some circulation conflicts. The good part is <br />that the revised layout is not really that different than what we originally <br />proposed. Therefore I am sure that we and the City can ultimately arrive at <br />a layout that is workable and handles everyone's concerns. However, we have <br />not reached that point, as yet. <br />In the meantime, as I felt that the canopy size was unlikely to change <br />significantly, I took the liberty of sending out requests for Canopy bids. <br />Those bids are due by the end of this week. This will allow us choose a <br />canopy supplier and, when the site layout is finalized with the City, complete <br />the canopy's engineering. That will give us a head start on securing the <br />canopy's building permits after Planning approvals. <br />843 Riske Lane, West Sacramento, CA 95691 (916) 372-1888 • Fax 373-1172 <br />Mailing Address: P.O. Box 1025, West Sacramento, CA 95691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.