Laserfiche WebLink
11 <br />n <br />�; �. 0;�� <br />4 _ <br />1� 1 ,_'t k1 !� <br />These written procedures are required by California UST Regulations, Section 2632(4)(1), must <br />be maintained at the UST location at all times, and are a condition of the operating permit. <br />Quik Stop Market #39 <br />2285 East Fremont Street <br />Stockton, California 95205 <br />The gasoline storage and dispensing system at this location consists of two (2) 12,000 gallon, <br />double wall fiberglass, brine filled interstitial, underground storage tanks serving two (2) double <br />sided blend dispensers (3 product). Product lines are double wall fiberglass. <br />A. - -The interstitial space of each tank and product line is monitored continuously by probes <br />within the brine reservoir and turbine sump, respectively. <br />B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br />Root. Leak conditions (except in dispensers) trigger visual and audible alarms located in <br />the monitoring system control panel, as well as shut off power to turbines. <br />C. The monitor control panel is located in the market storeroom. The monitor is placed in <br />test mode daily to check alarm function. Results are recorded on a "Daily Monitoring <br />System Inspection Log". <br />D. Monitoring is the responsibility of Rudy & Rose Duhaylungsod, Franchisees, or their <br />designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br />Quik Stop Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br />Environmental Affairs. <br />E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br />Department, which will in turn dispatch a qualified service contractor to the site. The <br />service contractor will determine the cause of alarm and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the Written Response Plan. <br />F. The monitoring panel and interstitial probes are checked and recertified annually. <br />Preventive maintenance is scheduled annually in conjunction with recertification. <br />G. _ _-_--A description of the gasoline system operation and operator's responsibilities are included <br />in the Franchise Agreement. Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br />personnel. <br />