Laserfiche WebLink
Monitoring System Certification <br />SitesAddress: Date of Testing/Servicing: <br />F.' In -Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes' ❑ No*. Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist- <br />- Yes <br />❑ No* <br />For equipment start up or annual- equipment certification, was a leak -simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: -g p h:°; ❑ 0.1 g:p h�; ❑ 02 g.p h? - <br />Notes 1. Required for equipment start-up certification and annual certification. <br />.2 Unless mandated by local agency, certification -required only for electronic LLD startup. • <br />fifYes <br />❑ No* <br />Were all LLDs confirmed operational and zcauate within regulatory requirements? <br />Yes <br />a No* <br />Was the testing apparatus properly calibrated? <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />OKY�es <br />❑ NIA <br />❑ Yes <br />❑ No* <br />For -electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />-- N/A <br />❑ Yes <br />a No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the. turbine automatically shut off if any portion of the -monitoring. system <br />,$ N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No*• <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H. <br />below. describe how and when these deficiencies were or will be corrected. <br />