Laserfiche WebLink
9 9 <br />PIPING SUMP CONTAINMENT TESTING <br />.................. <br />.............. - . . . . ...... <br />61, .0 E ............. eq ibwbMx� <br />to <br />.......... <br />M r <br />MOW. ro ess m. <br />...... ..... . own f <br />........... . ...... :.:. <br />U ...... 6000:: 0**,p r <br />0 <br />........... 71-71! ph <br />............. .......... <br />.... ............ ­ ...... <br />Mtioi�. uses............. ................. ........ .......... ...... ......... ... <br />...... ..... <br />b1fie 69" <br />............. re <br />P $sure <br />7 r.0 a <br />............ ........... ....... ................ ....... ............. <br />............. <br />...... .... <br />.......... <br />... ........ ....... ....... <br />M: r1nq1.:.jqul i.b....m...".'.e....n'.­..CUed Level t <br />an* Int <br />V <br />Id jl* System .200.11 WAII(on E-Mifi6ek <br />.............. ...... ...... <br />...... ................................. ................... ....... ...... ......... <br />... .......................... _ ........................ ..................... <br />........ ....... ....... ......... <br />a 42 ......... ........ ..... _., ........................ ....... <br />........... ....... .......... .. <br />................... ......... ............................. <br />A ........ .. <br />. ... ... ... . . <br />Sump Material <br />...... <br />.... FRP <br />FRP <br />....... ..... ....... <br />Sump Diameter (inches) <br />48" <br />....... ...... <br />...... .... <br />Sump Depth (inches) <br />...... 63 <br />... ... <br />62 <br />Product Stored <br />... <br />Gasoline - 91 <br />....... ...... <br />...... <br />Gasoline - 87 <br />...... Height from tank top to highest <br />...... <br />..... 21 <br />.... <br />....... <br />...... ..... <br />....... 20" <br />...... <br />..... <br />piping penetration <br />...... <br />...... <br />...... <br />....... ...... <br />...... ... ...... <br />.... ...... <br />...... ....... <br />..... ........ <br />Height from tank top to lowest <br />...... .. <br />19 <br />....... .... ....... <br />....... ....... ...... <br />17 ...... <br />... ...... <br />electrical Penetration <br />....... ...... ...... <br />Condition of sump prior to testing <br />Dry <br />....... ...... <br />... ....... ... <br />..... <br />Dry ....... <br />...... <br />Portion of sump tested <br />...... <br />Entire <br />... ....... <br />....... ..... <br />..... ..... <br />Entire ..... ..... <br />...... ..... <br />...... Is system programed for fail-safe operation? <br />..... <br />...... <br />....... ...... ..... <br />...... <br />....... Yes <br />Was fail-safe verified to be operational? <br />No <br />No ....... <br />Was sensor removed for testing? <br />Yes <br />..... ....... <br />Yes ..... ....... ..... <br />Was sensor properly replaced after testing? <br />..... <br />Yes <br />..... <br />...... ....... ..... <br />Yes <br />.... <br />. ..... <br />time for water level to stabilize (hr:min) <br />0:22 <br />0:22 <br />...... ....... <br />..... <br />..... Depth of water level from tank top (inches) <br />...... ...... <br />...... <br />23" <br />.... ..... <br />23 ....... ...... ...... <br />...... ..... <br />....... ..... ... <br />Test start time <br />9:40 AM <br />9:41 AM <br />Test end time <br />10:10 AM <br />10:11 AM <br />Test duration (hr:min) <br />0:300:30 <br />....... ....... <br />.... ....... <br />Change in water level 0.000 inches) <br />0.000 <br />... 0.000 <br />..... ...... <br />Pass/Fail threshold (0.005 inches Y2 Hr.) <br />...... 0.005 <br />...... <br />. ..... <br />0.005 <br />...... ...... <br />..... RESULT <br />...... ...... <br />..... r...: <br />...... PASS <br />...... <br />..... <br />..... ...... <br />..... . ....... <br />... PASS ...... <br />....... ...... <br />....... <br />Comments: <br />© 2002 Walton Engineering, Inc. <br />