Laserfiche WebLink
Triangle <br />T.E.I. SYSTEMS TAITL 14-k'Eh,V]2 LEA, <br />r <br />Facility: QUIKSTOP #00039 <br />Tank #: 2 Work #: 7405492 <br />Product: Unleaded Premium Test Date: 9/10/01 <br />Test Method: <br />Capacity: <br />Diameter (in): <br />Product Level (in): <br />Liquid Volume (Gals): <br />Liquid Percent (%): <br />Specific Gravity: <br />Coef of Expansion: <br />Water On Tank (in): <br />Water In Tank (in): <br />Product Temp. (F): <br />Head Pressure (psi): <br />Test Start Time: <br />Test End Time: <br />Test Rate (gph): <br />Test Result: N/A <br />Test Method: ULLAGE <br />UllageVolume (gals.): <br />Ullage, Test Time: <br />Ullage Vacuum (psi): <br />Ullage Result: N/A <br />Test Method: <br />R.J. FTA <br />Manufacturer: <br />Vaporless <br />L/D Model: <br />LD2000 <br />L/D Serial #: <br />04599 <br />Line Drain Back (ml): <br />50 <br />L/D Trip Time (sec): <br />2 <br />Holding Pressure (psi): <br />31 <br />Metering Pressure (psi): <br />24 <br />L/D Test Rate (gph): <br />2.1 <br />L/D Result: <br />PASS <br />Test Method: <br />TEI LT -3 <br />Pump Brand: <br />FE Petro <br />System Type: <br />Pressure <br />Line Pressure (psi): <br />52 <br />Line Start Time: <br />10:40 AM <br />Line End Time: <br />10:55 AM <br />Line Start Level: <br />260 <br />Line End Level: <br />260 <br />Line Test Rate (gph): <br />0.000 <br />Line Test Result: <br />PASS <br />M <br />