My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 8:24:50 AM
Creation date
6/23/2020 6:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231111_2285 E FREMONT_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes 1 ❑ No* I Were all probes reinstalled properly? <br /> ❑ Yes 1 ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> N Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ■ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ■ N/A or fails a test? <br /> LYesYe ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Replaced LLD in both 87 and 97 STP's. Vaporless LD2000. <br /> UN-036-3/4 Page 3 of 3 Rev.06/04/01 <br /> www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.