My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1985-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 2:40:09 PM
Creation date
6/23/2020 6:43:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1995
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1985-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. 13eu G®R► ler <br />Name of Supplier,. <br />er or Oealer <br />15. TANK TO TEST <br />�( iv®I- j A <br />Identity by position <br />---- <br />•I Brand and Grade <br />17. FILL -UP FOR TEST <br />_�_L ��i=—LtitK►e�•rrar G.�n, P S?Ota/Lto�r CQ ..,.�� b —�./ `S�i � j , <br />t. <br />Address No. and Streel ls) City Slate • Oalf of Test <br />15a. BRIEF DIAGRAM OF TANK FIELD 16. CAPACITY From <br />Nominal Capacity 1® <br />Gallons <br />By most accurate �Lf <br />capacity char) available <br />// Gallons <br />Stick Water Bottom /Jj1 <br />before Fill -up in. <br />,16 SS' ' altons <br />__ 6 In. <br />Tank Diameter <br />Inventory <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ❑ Water in lank Line(s) being tested with LVLLT <br />' See manual sections applicable. Check below and record procedure in log (27). <br />❑ High water table In lank excavation <br />Extend hose on suction tube 6" or mors <br />Use maximum allowable teat pressure for all testa. <br />19. TANK MEASUREMENTS FOR <br />In. <br />Four pound rule does not apply to doublewailed tanks. <br />TSTT ASSEMBLY <br />Complete section below: <br />Bottom of tank to grade' ............................ <br />/ 3 / In. <br />Add 30"for 'r, probe easy .... :.................... .. <br />30 In. <br />1. Is four pound rule required? Yes ❑ No <br />Total tubing to assemble — approximate ............./C <br />-r In. <br />10 <br />2. Height to 12" mark from bottom of tank <br />3. Pressure at bottom of lank <br />4. Pressure at top of tank <br />of burial <br />dia. <br />table <br />NOTES: <br />' �• / ® P.S.I. <br />wr '�_PS 1. <br />13/ In. <br />411 In. <br />6 a/ <br />The above calculations are to be used for dry soil conditions to <br />establish a positive pressure advantage, or when using the four pound <br />rule to compensate for the presence of subsurface water In the tank <br />area. <br />Refer to N.F.P.A. 30, Sections 2-3.2.4 and 2-7.2 and the tank <br />manufacturer regarding allowable system test pressures. <br />20. EXTENSION HOSE SETTING <br />Total Gallons <br />ReReadingy, <br />C7 <br />Tank top to grade' .................................. <br />✓ In. <br />Extend hose on suction tube 6" or mors <br />} <br />�•:, .� <br />.t^.I <br />below lank top ...................................... <br />In. <br />'If Fill pipe extends above grade, use top of fill <br />22. Thermal -Sensor reading after circulation ('b / <br />ts <br />D _7 `y-7-17 'F <br />( elween <br />23. Digits per °F in range of expected change <br />dlgl s <br />COEFFICIENT OF EXPANSION (Complete after circulation) <br />24a. Corrected A.P.I. Gravity <br />Observed A.P.I. Gravity ................................... <br />Hydrometer employed ................................... H <br />Observed Sample Temperature ......................... °F <br />Corrected A.P.I. Gravity <br />@ 60"F, From Table A.. .................................. <br />Coefficient of Expansion <br />for Involved Product <br />FromTable B ............................................ <br />Transfer COE to Line 25b. <br />25. �aL -- x (b) <br />Total quantity in Coefficient of expansion for <br />lull tank (16 or 17) Involved product <br />❑ Station Chart <br />Total Gallons <br />ReReadingy, <br />'eaa.. •% <br />KTank <br />❑ <br />❑ <br />Manufacturer's Chart <br />Company Engineering Data <br />Charts supplied with <br />} <br />�•:, .� <br />.t^.I <br />_ <br />U <br />Other <br />Stage I ,gstage u <br />Gallons <br />Total Gallons <br />ReReadingy, <br />'eaa.. •% <br />Log f 10 <br />— <br />Trani;4, total to line 25a <br />21. VAPOR RECOVERY SYSTEM <br />Stage I ,gstage u <br />A <br />24b. COEFFICIENT OF EXPANSION <br />RECIPROCAL METHOD j <br />GType of Product ......... .. <br />Hydrometer Employed .................................. H ., <br />Temperature In Tank j r'•t'i+i <br />After Circulation ..�/r.� <br />Temperature of Sample ................................. 7 ® .F,... , <br />".,t <br />+ F <br />Difference H/-) ......................................... ��'F <br />Observed A.P.I. Gravity ................................. <br />Reciprocal / G� 7 Page s > <br />/0,170 lif 76 <br />Total quanlily In Reciprocal Volume change In <br />full lank (16 or 17) this tank per •F L <br />Transfer to Line 26s <br />r <br />24c. FOR TESTING "WITH WATER <br />as Table C 6 D <br />Water Temperature after Circulstlon�- <br />TableC ............. ....'..... ......... ,.....: <br />Coefficient of Water <br />TableD .............................. I ................. <br />Added Surfactant? ❑ Yes ❑ No Transfer COE to Line 25b. <br />'-'-- gallons r <br />Volume change In this tank ¢ <br />par 'F 1t <br />a V l _bj_ l..-19 _;t71__ 1..__ This la 0 ®.Z1 `/ ¢^-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.