Laserfiche WebLink
•08/05/2003 08:31 12093653 TANKNOLOGY PAGE 05/11 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> TEST DATE:08/04/03 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER8227737, <br /> CLIENT:VA ARO AUSTIN,TEXAS 78757(512)451-6334 SITE: 641, <br /> Tank iD: 03 3 Tank mandoided: Z40 Bottom to top fill in inches: 182.0 <br /> Product: SUPR= Vent mandoided: YES Bottom to grade in inches: 199.0 <br /> Capacity in gallons: 10,118 Vapor recovery manifoided: YES Fill pipe length In inches: 54.0 <br /> Diameter in inches. 129.oo Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 184 Overspill protection: ns Stage i vapor recovery: DUAL <br /> Material: Dw STEER; Installed: ATGi Stage II vapor recovery ASSIST <br /> CP installed on: <br /> COMMENTS <br /> fi <br /> Start(in) End(in) New/passed Failed/replaced Now/passed Pailed/repiaced <br /> Dipped Water Level: 0.00 0.00 L.D.#1 i.t7.#1 L.D.92 L.D.#2 <br /> Dipped Product Level: 41.00 41.00 Make: Soon a T <br /> Probe Water Level: 0.050 0.050 <br /> ingress Detected: Water N Bubble N UllageN Model: <br /> SM: 011102-6791-e,9a <br /> Test time: 12:38-14:01 Open time in sec: 3.00 <br /> Inclinometer reading: 0.00 Holding psi: 22 <br /> VacuTect Test Type: multiple t s Resiliency in ml: 230 NOT <br /> VacuTect Probe Entry Point: Fill rest leak rate ml/m: 289.0 TESTED <br /> Pressure Set Point: -0.71 Metering psi: 12 <br /> Tank water level in inches: 0.00 Calib. leak in gph: 3.00 <br /> Water table depth in inches: 350.00 Results: pass <br /> Determined by(method): mown wzLL <br /> Result: PASS COMMENTS <br /> COMMENTS <br /> ALL TANKS ARE DOIIBLEWALL W/DRY AMULARS <br /> Impact Valves Operational: YES Material: DW Pismo <br /> Diameter(in): 2.0 <br /> Length(ft): 7.00.0 <br /> COMMENTS Test psi: 50 <br /> Bleedback cc: 60 <br /> Test time(min): 40 <br /> Test 1:Start time: 11=13 <br /> Finish psi: 0 NOT NOT NOT <br /> Vol change cc: a <br /> Test 2:start time: TESTED TEST= TESTED <br /> Finish psi: 0 <br /> Vol change cc: 0 <br /> Test 3:Stan time: 11:53 <br /> Finish psi: 11 <br /> Vol change oc: 0 <br /> Final gph: 0.000 <br /> Result PASS <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> Draft 08/05/2003 09:06 MSHAW <br />