Laserfiche WebLink
A`' Engineering 81 842 3760 p. 1 <br /> `u <br /> ;a <br /> Planning Engineering Construction Management <br /> 207 W. Alameda,Suite no.203,Burbank,Ca.91502 Ph. 818-842-3644, Fax. 818-842-3760 <br /> July 14,2003 <br /> To:Ms.Michelle Lee <br /> Fax:209-468-3433 <br /> Total no.of pages: 1 <br /> Re: 3641--1210 e. Hamerlane, <br /> Stockton <br /> Dear Michelle, <br /> Per our conversation,we respectfully request an extension for the above mentioned project's permits.As I <br /> mentioned to you,the work has already started and should be finished in the next 4-6 weeks. <br /> As far as the change in contractor,the new contractor is: <br /> Tritton Construction <br /> 3912 Portolla dr.suite no. 8 <br /> Santa Cruz,Ca.95062 <br /> License no.693807 <br /> Any questions,please do not hesitate to give me a call. <br /> Sincerely, <br /> ' mad illi8dezz <br /> Ahmad Ghaderi <br />