Laserfiche WebLink
Atoring System Certification <br /> Site Address: 1210 E. HAMMER LANE Date of Testing/Service: 08/02/2004 <br /> @ WEST LANE <br /> F. In-Tank Gauging/SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Q Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Q Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> E]Yes ❑No* Was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> fEDFX-jYes ❑No* Were all probes reinstalled properly? <br /> Yes 1:1 No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> ,In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. tine Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ®Yes ❑No* ❑N/A (Check all that apply)Simulated leak rate: ® 3 g.p.hE]0.1 g.p.h ❑0.2 g.p.h <br /> MX Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> FX-1 Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑X Yes ❑No* ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes [:]No* ❑X N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No* Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No' a N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No. Q N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> L'j Yes [:]No* Were all items on the equipment manufacturers'maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> All three tank Overfill alarms now programed to 90%. High product is 95% <br /> Page 3 of 3 Based on CA form dated 03/01 <br />