Laserfiche WebLink
SWRCB,January 2002 <br /> • AU 2 2003 of <br /> Page <br /> 9. SPILL/OVERFILL CONTAINMENT;B0.ur S'S r ` <br /> ras,fNot ui ed With S ilUOverfill Containment Boxes ❑ <br /> l Containment.Boxes are Present,but were Not Tested Q <br /> Developed By: ❑Spill Bucket Manufacturer @�industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Used: ❑Pressure Q Vacuum 2�Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 'T—c? s Equipment Resolution: <br /> Spill Box# Spill Bo r Spill Box# Spill Box# <br /> Bucket Diameter: 12, <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and ( � ( r'I r <br /> starting test: <br /> Test Start Time: CP <br /> Initial Reading(RI): 3 a �. <br /> Test End Time: /703 <br /> Final Reading(RF): � OZ— •� <br /> Test Duration: l S M i vl V►-1 i <br /> Change in Reading(RF-RI): - Q- 00'Z> <br /> Pass/Fail Threshold or <br /> Criteria: '1 6 e O 0�-- � a ' (0® � <br /> ?Test Result." ` �tVasslail aSS Earl: Q amass . O Fail O. Pass, Ll„Eail' <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />