My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_1996-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 11:40:15 AM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2004
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_1996-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> ®Tankmillogy <br /> TEST DATE:08/04/03 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2227731 <br /> CLIENT:VALERO AUSTIN,TEXAS 78757(512)451-6334 SITE:ULTRAMAR 641 <br /> Em <br /> Tank ID: #1 1 Tank manifolded: No Bottom to top fill in inches: 182.0 <br /> Product: UNLEADED Vent manifolded: YES Bottom to grade in inches: 199.0 <br /> Capacity in gallons: 12,041 Vapor recovery manifolded: YES Fill pipe length in inches: 54.0 <br /> Diameter in inches: 128.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 218 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> Start(in) End(in) New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Water Level: 0.00 0.00 L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Dipped Product Level: 87.00 87.00 Make: RED JACKET <br /> Probe Water Level: -0.026 -0.026 <br /> Model: Fx1v <br /> Ingress Detected: Water N Bubble N UllageN S/N: 40602-0233 <br /> Test time: 10:15-12:14 Open time in sec: 2.00 <br /> Inclinometer reading: 0.00 Holding psi: 18 <br /> VacuTect Test Type: Single tank Resiliency cc: 110 NOT <br /> VacuTect Probe Entry Point: Fill Fest leak rate ml/m: 189.0 TESTED <br /> Pressure Set Point: -0.50 Metering psi: 11 <br /> Tank water level in inches: 0.00 Calib.leak in gph: 3.00 <br /> Water table depth in inches: 250.00 Results: PASS <br /> Determined by(method): MONTR WELL <br /> Result: PASS COMMENTS <br /> COMMENTS <br /> ALL TANKS ARE DOUBLEWALL W/DRY ANNULARS <br /> Material: DW FISERG <br /> Impact Valves Operational: YES Diameter(in): 2.0 <br /> Length(ft): 100.0 <br /> COMMENTS Test psi: 50 <br /> Bleedback cc: 60 <br /> Test time(min): 40 <br /> Test 1:Start time: 11:15 <br /> Finish psi: 0 NOT NOT NOT <br /> Vol change cc: 2 TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Finish psi: 0 <br /> Vol change cc: 0 <br /> Test 3:Start time: 11:55 <br /> Finish psi: 11 <br /> Vol change cc: 0 <br /> Final gph: 0.000 <br /> Result: PASS <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> Printed 08/08/2003 10:40 JSTIEFER <br />
The URL can be used to link to this page
Your browser does not support the video tag.