Laserfiche WebLink
Monitoring System Certification-loge 2 of 3 <br /> r <br /> Site Address: 1210 E Hammer Ln Date of Testing/Servicing: 9/24/13 <br /> D. Results of Testing/Servicing <br /> Software Version Installed• 329.01 <br /> Com lets the foll ing checklist: <br /> H Yes ❑ No* Is the audible alarm operational? <br /> N Yes ❑ No* Is the visual alarm operational? <br /> IN Yes ❑ No* Were all sensors visually ins ected,functionally tested,and confirmed operational? <br /> 19 Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ® N/A operational? <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ® Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes ❑ No <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ❑ N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm trigger? 90 <br /> ❑ Yes* a No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all re lacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-up re orts, i a licable. <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturers specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Monitor Certification performed with Inspector for Permit Final due to Cold Start&TLS Battery <br /> replacement on 912/13. <br /> Removed debris from 91 STP Sump. <br />