Laserfiche WebLink
C <br />D. Results of Testing/Servicing <br />Software Version Installed: 329.01 <br />Complete the following checklist: <br />17J <br />>b Yes <br />r No* <br />Is the audible alarm operational? <br />Yes <br />No* <br />Is the visual alarm operational? <br />Yes <br />No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes <br />r No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />their proper operation? <br />Yes <br />r No* <br />10 N/A <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />io Yes <br />r No* <br />i" N/A <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring <br />system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors Initiate positive shut -down? (Check <br />all that apply) W' Sump/Trench Sensors; r Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ry Yes; r No <br />Yes <br />ir <br />r No* <br />N/A <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill <br />prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If <br />so at what percent of tank capacity does the alarm trigger? 90% <br />IT- Yes* <br />r No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E below. <br />Yes* <br />r No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />Product; PO Water. If yes, describe causes in Section E below. <br />f+ Yes <br />r No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes <br />r No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />in JeLuon t Deiow, aescrioe now ana wnen these aeticiencies were or will be corrected. <br />replaced veeder root light bulb <br />removed 1.8 gallons of water from 87 fill sump <br />removed 12 ounces of water from 91 fill sump <br />Monitoring System Certification Page 2 of 3 <br />iz/o' <br />