Laserfiche WebLink
L <br />C <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES® NO <br />Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />penton installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST installation Application <br />pages 4-8 as necessary for a timely pian review): <br />repair piping leak on what is believed to be the primary line into the secondary line <br />helium testing and excavation likely required <br />flex line leak suspected- but will amend the scope according to field conditions <br />testing and backfill will likely be required <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />determined according to field conditions <br />