My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2011-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 3:02:45 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2013
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2011-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?Garrett Backus [EH] <br />From: <br />Bryce Ruschhaupt [Bryce@CaPetroleum.com] <br />Sent: <br />Sunday, March 11, 2012 9:05 PM <br />To: <br />Garrett Backus [EH] <br />Cc: <br />Raymond von Flue [EH] <br />Subject: <br />Valero 3641 1210 E. Hammer Ln. <br />Attachments: Valero 3641 Secondary Containment Repair.pdf <br />Page 1 of 1 <br />Garrett: <br />We have located the secondary containment leak that was occurring between the primary and <br />secondary containment connection at the Regular fill riser bung and fiberglass containment surrounding it. <br />We made the repairs in the manor used by the original equipment manufacturer and not by using <br />fiberglass as indicated in our revised scope of work. Upon considering using fiberglass it was not recommended <br />as the way to make this seal by the manufacturer nor was it ever used by them in this manner. The use of <br />silicone as a bead positioned over the joint allows the material to be drown in when applied under vacuum and <br />is how the manufacturer originally manufactured the tank seal. It preserved the ability to make future repairs in <br />the same manor easily. Fiberglass does not bond well with steel, makes a very difficult repair should one need <br />to be made at a later time and could compromise the portion of original seal remaining over time. Please see <br />photos attached. <br />I would like to see if I can provide a test for you on Monday of the secondary containment. Please let me <br />know if you have time in your schedule to allow for this and what time would work best if you do. <br />Please call me at 530-774-4276 if you get this Monday morning so I can have the system under vacuum <br />Thank You <br />Bryce Ruschhaupt <br />California Petroleum Equipment Inc <br />Po Box -423, Chester CA. 96020 <br />530-774-4276 • Fax 530-259-4099 <br />CA Lic #432613 • A, B, C-10, C-61, Haz <br />bryce@capetroleum.com <br />3/12/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.