My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 2:54:41 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY CONTACT LISTING <br />Nature of Emergency <br />Phone Number <br />Ambulance <br />911 <br />Fire <br />911 <br />Police <br />911 <br />Poison Control Center <br />(800) 662-9886 <br />Chemical Spills <br />(800) 852-7550 <br />Hospital <br />911 <br />TRITON <br />(831) 475-8141 <br />All personnel assigned to this project will be required to demonstrate that they have <br />completed the Initial Training Requirements (40 hours). An annual 8 hour refresher course is <br />also required in accordance with 29 CFR 1910. <br />Field personnel from Triton and their sub -contractors will attend a project briefing for safety <br />issues and project work task review before beginning work. All Triton site personnel shall <br />have completed training relative to the project operations plans, and the materials to be <br />encountered during the project. <br />Triton personnel and sub -contractors engaged in project operations shall be participants in the <br />Medical Surveillance program, and must be cleared by the examining physician(s) to wear <br />respiratory protection devices and protective clothing for working with hazardous materials. <br />The applicable requirements under 29 CFR 1910 will be observed. <br />A. Examination Requirements <br />All Triton personnel on-site shall have successfully completed a pre -placement or periodic <br />medical examination in accordance with established Triton policies and procedures, and <br />SSP.Project No. 13 Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.