Laserfiche WebLink
JoaquinSan • <br />Environmental• <br />.11 East Main Street <br />Stockton, California95202-3029 <br />August 24, 2009 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />DIRECTOR <br />Donna Heran, RENS <br />ASSISTANT DIRECTOR <br />Laurie Cotulla, RENS <br />PROGRAM COORDINATORS <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Stig Werelius Sent via Email and Mail <br />Stantec <br />1137 N McDowell Blvd <br />Petaluma, CA 94954 <br />Fax: 707-765-9908 <br />Subject: Valero, 1210 E Hammer Lane, Stockton, CA (SR0057187) <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the AMENDED application for a permit to conduct an EVR phase II ISD upgrade. Concrete has <br />been broken and the product piping and under dispenser containments have been exposed to <br />install low -voltage wire conduit. The Veeder Root monitoring panel will be cold started during <br />this upgrade. The permit has been approved with the following conditions: <br />Conditions of approval: <br />1. Contact the local fire department, local planning or building department and the San <br />Joaquin Valley Air Pollution Control District for any applicable permits. <br />2. Any changes shall be submitted to the San Joaquin County Environmental Health <br />Department (EHD) for approval prior to commencing work. All new addenda supersede <br />the previous ones. <br />3. When the alarm history is cleared by the cold start, an alarm history printout must be <br />created before the cold start and available for EHD inspection. <br />4. Contact Garrett Backus (209-468-2986) to arrange the following inspection(s) (a 48-hour <br />notice is required): <br />a. The EHD must witness the testing of the functionality of the monitoring system <br />to ensure that monitoring has been restored to meet the requirements of <br />California Code of Regulations Title 23 and the Health & Safety Code. All <br />monitoring system sensors must be tested. Electronic line leak detectors must be <br />tested, if installed at this site. <br />b. Witness secondary containment testing of the product pipe and the under <br />dispenser containment. <br />5. A "Certification of Installation / Modification" form shall be submitted by the owner or <br />the owners' agent [pursuant to (CCR) 2635(d)] before this upgrade will be considered <br />complete by EHD. <br />6. All components must be certified by an independent testing organization and labeled as <br />required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See California Code of <br />Regulations (CCR), Title 23 Chapter 16 Table B for complete list). The component must <br />bear the appropriate mark as required by the independent testing organization. <br />Page 1 of 2 <br />