My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2005-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 2:54:41 PM
Creation date
6/23/2020 6:43:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2010
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2005-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />Garrett Backus [EH] <br />To: Werelius, Stig <br />Subject: RE: Valero Station, 1210 E. Hammer Lane - Addendum (SR0057187) <br />Attachments: 1210 Hammer Lane.pdf <br />Stig, <br />Here is the approval letter for amended permit application. The secondary containment testing for the product piping and <br />UDCs is done per the equipment manufacturer's instructions. Product piping is usually done by pressurizing the <br />secondary piping to 5 psi and holding for one hour. UDCs are usually tested by doing a hydrostatic test for 24 hours. <br />There are also accelerated hydrostatic tests using test equipment such as Incon. <br />Garrett Backus, REHS <br />San Joaquin County Environmental Health Department <br />600 E. Main Street <br />Stockton, CA 95202 <br />telephone: (209) 468-2986 <br />fax: (209) 468-3433 <br />email: gbackus@sjcehd.com <br />From: Werelius, Stig [mai Ito: Stig.Werel ius@stantec.com] <br />Sent: Friday, August 21, 2009 3:07 PM <br />To: Garrett Backus [EH] <br />Cc: Sexton, Tom® Huff, Sandy; Duane Irelands Schafer, Craig; Tim Stornetta® Denise Stornetta <br />Subject: Valero Station, 1210 E. Hammer Lane - Addendum (SR0057187) <br />Garrett. <br />Thank you for taking the time to discuss this project with me. <br />Attached you will find the revised drawing and an addendum letter. <br />When we spoke, you mentioned secondary containment testing for the piping and sumps. Can you please specify <br />exactly which tests we are going to be required to perform? <br />Again, thank you for your time and assistance. Call me with any questions or comments. <br />Respectfully, <br />Stig Werelius <br />Assistant Project Manager <br />Stantec <br />1137 North McDowell Boulevard <br />Petaluma CA 94954 <br />Ph: (707) 765-1660 Ext. 751 <br />Fx: (707) 765-9908 <br />stig.werelius@stantec.com <br />Statltec.com <br />The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for <br />any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify <br />us immediately. <br />14 Please consider the environment before printing this email. <br />8/24/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.