Laserfiche WebLink
" Work Order: 2258394 <br />(ESO) & (ESV) Testing Fomi - Version I- 1/30/2007 <br />IkC -,0 <br />r <br />NLER <br />Emergency Shut Off (ESO) & <br />Dispenser Emergency Shutoff Valve (ESV) <br />ANNUAL TEST RECORD LOCATIONS AND TEST DATA . <br />Testing I _r / ; <br />Address: <br />SOF <br />36 y I State ID #: <br />City: I --YrVk fP4 State: <br />Emergency Shut Off (ESO) Testing Results <br />On °7 �S og in accordance with "ESO Vendor Letter (3-21-05).doc", from Valero's Retail <br />Compliance Department, as a part of annual compliance testing, this representative tested the <br />ErneEgency Shut Off ESO) switches indicated on this sketch. Findings listed below: <br />Emergency Shut off (ESO) If No, Provide <br />Operational? Maintenance Lo # <br />=N g Date Called <br />ispenser EmergeM Shutoff Valve (ESV) Testine Results <br />On 7-16-wY in accordance with NFPA 30A this representative tested the automatic -closing feature <br />of the Dispenser Emergency Shutoff VALVE(S) (ESV) located in the supply lines at the base of each <br />individual island type dispenser indicated on the diagram below. Each device (#) 7Y in all, <br />would automatically close. Findin s listed below: <br />Disp. Emergency Shut Off If No, Provide <br />Valve (ESV) Operational? Maintenance Log # Date Called : <br />Tanknology Inc. 8501 N. MoPac Expressway, Suite 400, Austin, Texas 78759 <br />