Laserfiche WebLink
AMhJTNIFIED PROGRAM CONSOLIDATED FO-N'gk <br /> W UNDERGROUND STORAGE TANK VF <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING 490-54a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> El 1.CONTINUOUS ELECTRONIC MONITORING 10 2.FLOAT AND CHAIN ASSEMBLY [13.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS [199.OTHER(Specify)_ q�(;7�.j— MODEL#: <br /> - ------------------------------------------------------------------ 490-56. <br /> PANEL MANUFACTURER: <br /> --------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------- <br /> LEAK SENSOR MANUFACTURER: 410-11 1 MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS El a.YES 0 b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN El a.YES ED b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES ®b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES El b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 9 1.SINGLE-WALLED [:12.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-644 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: El 1.LIQUID El 2.PRESSURE [3 3.VACUUM ---------------------------------------------------------------------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS [I a.YES E3 b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> El 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)j MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) <br /> ---------------------------------- ---------------- <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> N Alarm logs 490-68a El Visual Inspection Records 490-68b El Tank integrity testing results 490-6k <br /> El SIR testing results(and supporting documentation records). 490-68d El Tank gauging results(and supporting documentation records). 490-68c <br /> ❑ATG Testing results(and supporting documentation records).490-68f E] Corrosion Protection 60-day logs 490-68g <br /> Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> El STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h.M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> )0, Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> The overfill prevention method is audio/visual alarm set at 90%of the tank capacity <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Tam y Hutchinson 490-72 TITLE Manager 490-73 <br /> NAME Don Marcetti 490-74 TITLE Area Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.-OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: <br /> 490-77 <br /> 11g& �) / <br /> RURESEN'FING:0 1.Tank Owncr/Operator 0 2.tr:gilitv Owner/oneuitor 0 3.Authorized Representative of Owner <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-799 <br /> Sandy Huff Compliance Coordinator <br /> UPCF UST-D(12/2007)2/3 <br />