My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:18:43 PM
Creation date
6/23/2020 6:43:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of pians & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ) NO & <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates far each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the `Site Health and Safety <br />Plan' is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />MVJJM piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): Rdn� ��q{�� 4t � <br />>r <br />—. Remove elephant trunk "secondary flex" under the UDC on the 91 -product line <br />_• Remove the primary 91 product flex line <br />• Install new primary 91 product flex line <br />". Re -install elephant trunk and tighten clamps <br />.. • Test 91 product line <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Q0 u <br />EH230038 (revised 7-28-2018) <br />k11 <br />AUG () 9 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.