My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:18:43 PM
Creation date
6/23/2020 6:43:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S,WRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer U Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution:RNMEMMENEEM <br /> no= Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: dkea <br /> Piping Manufacturer: `/ N e2 <br /> Piping Diameter: 4_1 <br /> Length of Piping Run: p p® !— <br /> Product Stored: cj <br /> Method and location of <br /> piping-run isolation: rJ s 6 P 5 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 1 t � lls <br /> Test Start Time: /0 i to !� ' t® /0 : 16 <br /> Initial Reading(R): CPS; <br /> Test End Time: <br /> Final Reading(RF): ` <br /> Test Duration: <br /> Change in Reading(RF-Rj): Q <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass CI Fail Pass C]Fait Pass ❑Fail L7 Pass C7 Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> �� U,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.