Laserfiche WebLink
S,WRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer U Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution:RNMEMMENEEM <br /> no= Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: dkea <br /> Piping Manufacturer: `/ N e2 <br /> Piping Diameter: 4_1 <br /> Length of Piping Run: p p® !— <br /> Product Stored: cj <br /> Method and location of <br /> piping-run isolation: rJ s 6 P 5 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 1 t � lls <br /> Test Start Time: /0 i to !� ' t® /0 : 16 <br /> Initial Reading(R): CPS; <br /> Test End Time: <br /> Final Reading(RF): ` <br /> Test Duration: <br /> Change in Reading(RF-Rj): Q <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass CI Fail Pass C]Fait Pass ❑Fail L7 Pass C7 Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> �� U,� <br />