Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(Upg TESTING <br /> Test Method Developed By: -,UDC Manufacturer Industry Standard X Professional Engineer <br /> Other(Specify) <br /> Test Method Used: 17 Pressure Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> SEEMEEM <br /> UDC# 1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDrDeacturer: Bravo Bravo Bravo Bravo <br /> UDal: Coated Steel Coated Steel Coated Steel Coated Steel <br /> UD9" 9" 9" 9" <br /> Height from UDC Bottom to Top Enters from bottom Enters from bottom Enters from bottom Enters from bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from bottom Enters from bottom Enters from bottom Enters from bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Level 6" Water Level 6" Water Level 6" Water Level 6" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No No No <br /> product and water)?* <br /> Turbine shutdown response time NA NA NA NA <br /> Is system programmed for fail- <br /> Yes Yes Yes Yes <br /> safe shutdown. <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:52 9:57 10:02 10:07 <br /> Initial Reading (RI): .001 .001 .001 .001 <br /> Test End Time: 10:22 10:27 10:32 10:37 <br /> Final Reading(RF): .001 ➢ .030 ➢ .030 ➢ .030 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> -Change in Reading (RF—RI): 0 ➢ .030 ➢ .030 ➢ .030 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Fail Fail Fail <br /> Was sensor removed for testing? No No No No <br /> Was sensor properly replaced and NA NA NA NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC's 3&4 will not maintain test level and has a gross loss>.030 in 30 minutes. <br /> UDC's 5&6 will not maintain test level and has a gross loss>.030 in 30 minutes. <br /> UDC's 7&8 will not maintain test level and has a gross loss>.030 in 30 minutes i L� <br /> ,r. <br /> Recommend a repair contractor be consulted to reseal all bottom penetrations and Secondary Pipe Hex Nut Seals. <br /> Repair or replace Cracked Hex Nut on Super 91 at UDC#5&6. OCT 10 2017 <br /> Note: A Dispenser Pan Upgrade would solve all the above mentioned issues. <br /> NVIRONMENTAL HEALTH <br /> DEFARTMENT <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />