My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:18:43 PM
Creation date
6/23/2020 6:43:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> Step 2 - Dry fit your riser to verify your measurements. <br /> A. After you have dry fitted all components and are satisfied with your measurements, apply <br /> an approved fuel resistant, non hardening thread sealant (pipe dope) to the NPT threads on <br /> both ends of the tank risers. <br /> Step 3 - Install the correct length tank risers <br /> A. Install and torque the 4" tank risers into the tank bungs. <br /> 85000-1 Series Spill Container Installation <br /> Step 1 — Preparing the Black Spill Container for Installation <br /> A. Inspect the black spill containers ensuring that the '/" flat seal is in place and properly <br /> oriented for sealing onto the flared top of the drop tube (Fill) or on the M/F 4X4 Riser <br /> Adaptor (vapor). On Fill spill containers ensure the drop tube has the special Phil-Tite "O" <br /> Ring (85039-DT) installed under the upper drop tube flare and is seated on top of and <br /> inside the M/F 4X4 riser adaptor installed on top of the tank riser. If you are using a <br /> straight drop tube from a different manufacturer, discard the "O" Ring that may have been <br /> shipped with this drop tube and use the special Phil-Tite "O" Ring (85039-DT) that is <br /> shipped with each Fill Spill Containers. <br /> B. 85000-1 Fill Only. Inspect the foam filter located inside the container. The filter should be <br /> lying flat and secured by the stainless steel snap ring. Move the drain valve handle back <br /> and forth making sure that the lower screen assembly rises (compresses) when moved to <br /> the open position and extends when closed. The drain valve handle should move freely <br /> with no binding and must snap into place when moved to the closed position. <br /> C. ALL SPILL CONTAINERS - NOTE: DO NOT USE ANY TYPE OF THREAD SEALING <br /> COMPOUND (PIPE DOPE) FOR SPILL CONTAINERS INSTALLATION! Apply an <br /> even coat of Anti-seize compound to the black spill container female threads <br /> and/or to the M/F 4X4 riser adaptor male threads or apply a light Silicon based <br /> spray. This will reduce the friction between these threads during installation and aid in <br /> removal of the spill containers at a later date. <br /> Phil-Tite Spill Containers create an optimum, leak free seal when properly tightened <br /> (torque) to the M/F 4X4 riser adaptor. <br /> When installing the black spill containers in a direct bury application apply an even coat of <br /> Silicon based spray to the large outer "O" Ring seal of the black spill container and to the <br /> inside of the stainless steel sleeve to ease insertion. <br /> Note: For multi-port installations - Apply an even coat of Silicon based spray to the large <br /> outer"O" Ring seal of the black spill containers(s) and to the inside of the stainless steel <br /> sleeve(s)just prior to installing the manway cover with stainless steel sleeves. This will <br /> aid in installing the manway cover over the installed spill containers. <br /> t t Np, <br /> ENVIRONME SAL HEAi.TH <br /> ?ERP.IT1SERVT,PS <br /> 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.