My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:41:49 PM
Creation date
6/23/2020 6:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> 0 C T 1 0 2018 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC J TESTING <br /> Test Method Developed By: ❑UDC Manufacturer P9 Industry Standard ❑Prc8r4Vff#6*F_NTAL F EALTH <br /> ❑Other(Spec) <br /> DER'A'RT-MEW <br /> Test Method Used: ❑Pressure ❑ Vacuum JZ]Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002 Inches <br /> UDC# 1/2 UDC# 5/6 UDC# UDC# <br /> UDC Manufacturer: Bravo Bravo <br /> UDC Material: Steel Steel <br /> UDC Depth: 10.. 101, <br /> Height from UDC Bottom to TOP Bottom Bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Bottom Bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good <br /> testing: <br /> Portion of UDC Tested' 2"Above Piping 2 Above Piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A <br /> Lioduct and water)?* <br /> Turbine shutdown reSPODse time INIA NIA NIA N/A <br /> Is system programmed for fail- ❑Yes ❑No [21 NA ❑Yes ❑No Z NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No [?]NA ❑Yes ❑No ®NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test <br /> Test Start Time: 9:36 am 10:25 am <br /> Initial Reading(R,): 3.5087 Inches 2.7664 Inches Inches — Inches <br /> Test End Time: 9:51 am 10:40 am <br /> Final Reading(.RF): 3,5067 Inches 2,7661 Inches Inches Inches <br /> Test Duration: 15 Minutes 15 Minutes <br /> Change in Reading(RF-R,): 0.0020 0.0003 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0,002 <br /> Test Result: 2 Pass ❑Fall 21 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? V1 Yes ❑No ❑NA V1 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor property replaced and [2 Yes ❑No ❑NA R]Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for•failed tests) <br /> "Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment <br /> testing scope of work". <br /> Installed conduit boots in UDC 1/2 and 5/6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.