My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:41:49 PM
Creation date
6/23/2020 6:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231125_1210 E HAMMER_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> RECEIVED <br /> AUG 16 2018 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ❑✓ Industry Stand ' V 1 R iS:libt) <br /> ❑Other(Spec) D I:PA RT NI E N T <br /> Test Method Used: [Z]Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Test reducer boots, Nigrogen and gauges Equipment Resolution: 0.5%of span PSI <br /> Piping Run#91 Primary Piping Run#91 Sec. Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 2" <br /> Length of Piping Run: 200' 200' <br /> Product Stored: Gasoline Gasoline <br /> Method and location of <br /> piping-run isolation: Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> starting test: <br /> Test Start Time: 12:40 pm 2:36 pm <br /> Initial Reading(RI): 50 PSI 5 PSI PSI PSI <br /> Test End Time: 1:40 pm 3:36 pm <br /> Final Reading(RF): 50 PSI 5 PSI PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Rr): 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: I OPass []Fail I ®Pass []Fail I ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Installed Bravo Flex Boot to 91 Product Piping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.