Laserfiche WebLink
� 1 <br /> SECONDARY PIPE TESTING <br /> .........................................................................................................................................................---.............-................................-................................................................ <br /> ................................................................................................................................................................................................................................................................................. <br /> 1E3;;:a8ltE�_ : <'»> ><> >">'` '` :> Nlattitifact>r r' IsE 5#arda # `:< cafe sinaE':<<>r' <:': L?fier reel>:<'» z <br /> . Y ::.: ::. .. i. �:...: ..:... . .:.�..... <br /> . :.....: ........ <br /> ..... . . <br /> t..M+E'f 1QC S S r.....,........ ^PressiJre p Uaeuum.: .., Q.:11 ,©static:.., 0 {?theC'(see�ieloHt)` <br /> ...................::::....::.......:::;:.....:........:.:::.:..........................................................:.............:::...:..................................:. ...........:..:...........:...:::..............::............................. <br /> Equipment..E�ressure Gau .....(range toad:..... ............................................ ........... . ... . <br /> P .>sn :Rl�n# :. P€.tt�l Rctt .;:. [ to Run#3.::: P€: n <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Pipe Type FRP FRP FRP FRP <br /> Prima Pie Diameter inches 2" 2" 2" <br /> Primary P (inches) . 2.. <br /> Hinz <br /> Secondary Pipe Diameter(inches) 3" 3" 3" 3" <br /> Product Stored Gasoline-91 Gasoline-89 Gasoline-87 Diesel <br /> »>Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot Termination Boot <br /> »>Location of secondarYPi e isolation SUMP SumP Sump SumP <br /> Estimated length of piping run(feet) 255' 245' 235' 200' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize hr:min 0:45 0:26 0:17 0:08 <br /> P ( ) <br /> Test start time 9:30 AM 9:31 AM 9:32 AM 9:33 AM <br /> XXXInitial pressure(psig) 3 3 3 3 <br /> Test end time 10:30 AM 10:31 AM 10:32 AM 10:33 AM <br /> Final pressure(psig) 3 3 3 3 <br /> Test duration(hours:minutes) 1:00 1:00 1:00 1:00 <br /> Change in pressure(psig) 0 0 0 0 <br /> Pass/Fail threshold 0.5 <br /> 0.5 0.5 0.5 <br /> TEST RESULT <br /> PASS PASS PASS PASS <br /> Comments: <br /> 0 2002 Walton Engineering,Inc. <br />