Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foilowin checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,includingtesting for ground faults? _ _- <br /> ❑ Yes ❑ No* Were an tank gauging probes visually' for damage and residue buildup?—— — -- - <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was acc uracy of system water'level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these detrdencies were or will be eorrec&d. <br /> G.Line Leak Detectors(LLD): ❑ Check this box if L-Ds are not installed. <br /> Complete the folio checldist: <br /> Yes ❑ No* For equipment start-up or annual equipment cion, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apPly) Simulated leak rate .ph.; ❑0.1 gp h; ❑0.2 gp.h. <br /> Yes 13 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LID restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes Cl No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑'Yes Cl No* For electronic I I ,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? - - <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> des . ❑ No* Were all items on the equipment manufactur+es maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments• <br /> Noe 3 43 <br />