My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_1999-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:00 AM
Creation date
6/23/2020 6:44:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2003
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_1999-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I , <br /> i <br /> The FE Petro STP-MLD leak normal static system pressure,three GPM.This is the indication to the <br /> detector is a three position,pressure- GPH(at 10 psi)is metered through the operator that a leak is present.If <br /> sensing,piston operated valve STP-MLD into the piping system.If a there are no leaks,pressure rapidly <br /> designed to continuously monitor the leak is present that equals or exceeds builds in the system forcing the <br /> piping by indicating any leakage in the this amount,as much product escapes STP-MLD to open to the firll-flow <br /> piping between the discharge and the from the system as is metered through position.In a system with no leaks,it <br /> submersible pump and the solenoid the STP-MLD-Under this condition, takes approximately three seconds for <br /> valve in a service station dispenser_ pressure cannot build up in the piping a complete test.No further line testing <br /> When the submerged pump is system.When a nozzle is opened,a takes place until the line pressure <br /> turned on after the system pressure poppet in the STP-MLD moves to a drops significantly below the normal <br /> has dropped significantly below the position that restricts the flow to 2 static system pressure. <br /> 1. The ripped or Bottom 2. Leak Sensing Position 3.Non-Leak or Full Flow <br /> the system is less than 1 psi,the on <br /> Whenn the sIn this position the system pressure Position <br /> has increased to approximately 12 psi This position allows full flow.The <br /> piston and poppet are in the and all the flow must travel around poppet will remain in approximately <br /> "bottom"or"tripped"position.In this the metering pin which limits it to this position as long as the system <br /> Position of the poppet,product flows approximately a 3 GPH rate(at 10 psi). pressure remains at about the <br /> through the horizontal hole in the pop- If there is a leak in the system which pumping pressure.If the pressure in <br /> pet and around the metering pin at a will allow leakage to exceed this amount, the system drops when the pump is <br /> rate of approximately 2 GPM the line pressure will not build beyond turned off,either due to thermal <br /> flow into the delivery line when the this point and the valve will remain in contraction of the product or due to a <br /> submersible pump is running_In the leak sensing position with the main leak,the piston moves downward and <br /> normal operations the piping remains flow blocked.If there is an attempt to the poppet engages and seals inside <br /> full of fluid and when the submersible dispense while the valve is in this posi- the cage at about 3 psi,or approxi- <br /> pump is turned on,with a flow rate of tion,the line pressure will drop to less mately 10 feet of head,in gasoline. <br /> 2 GPM through the poppet,pressure than i psi,the piston will respond,and Any time the pump is turned on after <br /> builds rapidly and the poppet moves to the poppet will return to Position 1 the seal on the <br /> the leak sensingposition- poppet is inside the <br /> p° where 2 GPM will flow to the dispensers. cage,a line test will be performed. <br /> Leaks smaller than 3 GPH will be indi- <br /> cated by the STP-MLD taking longer <br /> than three seconds to open completely <br /> because some of the flow leaks out of <br /> the system and the rest builds pressure_ -- — __ V <br /> If there is no leakage in the system, Z <br /> the small flow around the metering pin FE Petro,Inc.■ 4805 Voges Road ` <br /> increases the line pressure and in P_O.Box 139 • McFarland,WI 53558 <br /> approximately three seconds the piston (608)838-8786■ Fax:(608)838-6433 <br /> will move the poppet to Position 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.