Laserfiche WebLink
UST PROGRAM INSPECTION REPORT <br /> Facility Name: dVU-Ca1Q- Address: <br /> 1 � vt <br /> 25 CCR 2643 (d) Triennial tightness test of suction piping that is not continuously <br /> monitored <br /> 26 CCR 2643 (e) Biennial tightness test of gravity piping that is not continuously <br /> monitored <br /> 27 CCR 2662 Upgrade requirements for UST system <br /> 28 CCR 2661 Permit to repair UST system <br /> 29 HSC 25286(a) Permit to alter monitoring system <br /> 30 HSC 25298 (a) Illegal abandonment of UST system <br /> 31 HSC 25298 (b) Permit to temporarily close UST system <br /> 32 HSC 25298 (c) Permit to'close UST system <br /> 33 Violation(s)not listed above <br /> Observation(s): <br /> "e- 7 <br /> ca eti r ► s <br /> 42, UCA <br /> C r t Y <br /> - <br /> �..�-� g/ <br /> - 4CO <br /> i Y r c� <br /> Inspection: Type c� Date C <br /> RENS Pring ` Ye- a. --f'e <br /> Received b c" Prvnt <br /> Title Phone <br /> PHS 260(8/04/00) 2 of <br />