Laserfiche WebLink
SWRCB, January 2002 <br />Page 2. <br />9. SPI.1,1JOVERFILL CONTAINMENT <br />BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: D <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: E] <br />Test Method Developed By: <br />F]Spill Bucket Manufacturer M <br />Industry Standard <br />Professional Engineer <br />Other (Specify} <br />. <br />Test Method Used: <br />F]Pressure F1 <br />Vacuum Fx] <br />Hydrostatic <br />F-1Other (Sped) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # 87 <br />Spill Box # 87 <br />Spill Box # 89 <br />Spill Box 89 <br />Bucket Diameter: <br />14 <br />77 <br />14 <br />14 <br />14 <br />Bucket Depth: <br />12 <br />12 <br />12 <br />12 <br />Wait time between applying <br />pressure/vacIfturt/water and <br />30 <br />30 <br />30 <br />30 <br />starting test: <br />Test Start Time: <br />0930 <br />0930 <br />0930 <br />0930 <br />Initial Reading (Rt <br />8 <br />8 <br />8.5 <br />9 <br />Test End Time: <br />1030 <br />1030 <br />1030 <br />1030 <br />Final Reading (RF <br />8 <br />8 <br />8.5 <br />9 <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (R F- R!) <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />0 <br />0 <br />0 <br />0 <br />Criteria: <br />Comments - (include iqforination on repairs matte P7401- to testing, and recommended follow -zip for failed tests) <br />