Laserfiche WebLink
Rut 18 06 02:18P Mar Tom Muru 209-8 1414 P.2 <br />Designated Operator (DO) Employee Training <br />Site Number: DO Name& Certificate No.: <br />Site Address: K <br />7- <br />0 Designated UST Operator's Primary Rcsponsibilities <br />I. Monthly visual inspections of,the us"r facility <br />2. On-the-job training ii)r "facility employees" every twelve months, starting July 1, 2005. <br />Employees hired on orallcr July 1, 2005 must be trained within 30 days of their date of hire. <br />0 DO Employee Training Topics <br />1. Underslin—ding 1ST System Components and Oncration% <br />A. Tank information for the site: Size, Material,. installation date, and type <br />B. Overfill and spill protection: Turbine sumps, spill buckets, and under -dispenser Containments <br />C. Piping: Material, types and installation date <br />D. Site Plot Plan – Locations of UST systems (HMMP) <br />2. Understanding l,cak Dge S stemLc <br />wOPPAY <br />A. us'r leak detection methods (e.g;., ATG, SIR, CSLD, or CK and devices (e.g,, Interstitial <br />Monitoring), product piping leak detection, sensors in the SUITIPS, <br />B. Types and functions of leak detection systems (e.g., electronic or mechanical) <br />C. Tank Testing Results, Inventory Reconciliation and Daily & Monthly Inspection Checklists <br />3. Re - ondin Lig stem Afg. <br />_ arms <br />A. Difference between an alarm and a system fifflurc ([delivery Necdcd & Fuel Alarms) <br />6. Emergency Contact Information – SolvOne or Regional I ISE Specialist , <br />C. Alarm Log Update %&foil; f 7W 4tlel, rtA 1 SO A1-9 -9 /. ez A 9 <br />4. Spill!& Leak Res <br />pons <br />A. Spill/Overfill Response Procedure <br />B. Spill response equipments <br />C. Emergency Shut-off Button <br />D. Disposal of Waste <br />61.2q <br />_TDaLL <br />.=7Si#nLture_ J . Lm to ee Name Si atur Date <br />-F <br />MAINTAIN THIS FORM UNDER ENVIRONMENTAL 11RCORD BOX TA13 #4 <br />