My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:03:59 PM
Creation date
6/23/2020 6:44:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank (UST) Operator <br />Monthly Visual Inspection Checklist <br />Facility Name: ConocoPhilli s Site #2705447 <br />Date: 6/28//06 <br />Facility Address: 1469 E. Hammer Ln. <br />City: Stockton <br />Zip Code: 95210 <br />Designated UST 22erator Conducting the Inspection: Julie Lee <br />International Code Council Certification #: 5248777 -UC <br />Expiration Date: 12/14/2006 <br />signature: <br />Phone: (510) 245-5218 <br />Y = Yes, N = No, NA=N-..-, livable <br />Item MONITORING PANEL / ALARM HISTORY Y N NA <br />SEENEEM <br />1 Monitoring system is owered on and in proper operating mode. x <br />2 Monitoring system is not currently showing an alarms or warnings. x <br />3 Alarm history reportilog for the previous month is available, and has been reviewed by the x <br />Designated UST Operator. Attach a copy of the alarm history report/7oreportl7og to this orm i available. <br />4 Each alarm for the previous month has been responded to a ro natel . x <br />5 Sensors located in tank -!Lop containment sumps have not alarmed in the past month. x <br />5a _ List all tank -top sumps where alarms occurred in the past month: <br />N/A <br />Note: Sumps where an alarm has occurred in the past month must be inspected unless a qualified service technician responded to, and <br />properly addressed, the cause of the alarm. Attach documentation verifying appropriate service to this report. <br />I sum ins ection is re uired, record results in item 6, below. <br />UST SYSTEM INSPECTION <br />6 Tank -top containment sumps are free of water, debris, and hazardous substance. Sensors are located properly. <br />Note: Visual inspection o sum s is ondy required in sumps where an alarm has occurred in the past month or which there is no service record. <br />Y N Y N <br />Sump Location: S <br />ump <br />Sum Location: Sump Location: <br />Sum Location: ation: <br />7 Spill contaimnent structures are free of water, debris, and hazardous substance. <br />Y I N INA Y N NA <br />Tank 1— Contents: 91 x Tank 3 — Contents: 87 x <br />Tank 2 — Contents: 89 x I I Tank 4 — Contents: Diesel x <br />8 Under -dispenser containment areas are free of water, debris, and hazardous substance. Sensors are located properl . <br />Y N NA Y I N INA <br />Dispenser 112 x Dispenser 9110 x <br />Dis enser 3 / 4 x Dispenser 11 / 12 <br />Dispenser S / 6 x Dispenser 13 114 <br />Denser 7 / 8 x Dis enser 15 / 16 EM <br />PAPERWORK INSPECTION Y N NA DATE DONE <br />9 Monitoring system certification has been completed within past 12 months. x 5/05/05 <br />10 Secondary containment tests have been completed within the required timeframe. x 9/13/04 <br />11 Spill containment structure bucket testing was completed within the past year. x 5/05/05 <br />12 Tank tightness tes!!29 was completed within required timeframe. x <br />13 Line tightness testin was completed within required timeframe. x <br />14 Other required testin maintenance was completed within re uired timeframe. List test/maintenance items below. <br />Test/Maintenance: <br />Test/Maintenance: <br />Test/Maintenance: <br />FACILITY EMPLOYEE TRAINING Y N NA <br />15 All facility employees have received the required on -the job trainin within the past year. x <br />16 All facili em to ees hired within the East 30 da s have received the re uired on -the job training._____ x <br />Note: Any answer of "N" should be explained in the comment section on the following page, and will require <br />follow-up action. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.