Laserfiche WebLink
UPCF UST -D (12/2007)1/4 <br />s NIFIED PROGRAM CONSOLIDATED FOWL ! U <br />_�' <br />UNDERGROUND STORAGE TANK v <br />MONITORING PLAN - Pae i of 2) <br />E OF ACTION ® 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION L <br />490-1 <br />PLAN TYPE ❑ 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. r j 1 1., ;_ t ._ I DUI <br />$ I H <br />Lf y 1 7i1� t L.t'u S If <br />490-2 <br />- <br />(Check one item only) ® 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( 87 91 and Die <br />L FACILITY INFORMATIONu <br />FACILITY ID # (Agency Use Only) <br />1 <br />BUSINESS NAME (Same as FACILITY NAME) Convenience Retailers LLC #2705447 <br />3. <br />BUSINESS SITE ADDRESS 1469 East Hammer Lane 103' <br />CITY Stockton <br />104. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />(23 CCR §2632, 2634, 2638, 2641) <br />- - - - - - -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------3a <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY El99.OTHER (S eci <br />P �)� <br />490-3a <br />490-3b <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ® 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)4904 <br />IV. TANK MONITORING IS`PERFORMED USING THE FOLLOWING METHOD(S): <br />® 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />490-5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />490-6 <br />--------------------------------------------------------------___---------------------------____-_---------------------______----------490-7-----------------------------___-__--'------------------------------------ <br />PANEL MANUFACTURER: Veeder Root MODEL #: TLS350 <br />490-8 <br />-------------- - - - ---------------------------------- - + - 490-10 <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9. I MODEL #(S): 402 490-10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 490-12. MODEL #: <br />490-13 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): <br />490-15 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />490-17 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHER (Specify): <br />g.p.h. g.p.h. ( P 'J)• <br />490-18 <br />490-19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: Ela. 36 HOURS El b. 60 HOURS <br />490-22 <br />❑ 5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />490-23 <br />FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY 171 c. OTHER490-24 <br />TEST FRE Q (Specify): <br />490-25 <br />F199. OTHER (Specify): <br />490-26 <br />490-27 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />® 1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-29 <br />------------------------------------------------------------------------------------------------------------------------------------------49 --------------------------------------------------------------------------- <br />PANEL MANUFACTURER: Veeder Root 490-30 i MODEL #: TLS350 <br />490-31 <br />- ------------------------------------------------------T;5-----t <br />----------------------- - - - - - - - - - - - -- - - -490-32 � <br />SENSOR MANUFACTURER: Veeder Root i MODEL #(S): 208 <br />490-33 <br />________LEAK <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO <br />490-34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-35 <br />® 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 <br />490-36 <br />________ --------------------------------------------------------------------------------------- ------ ------------------------------------------------------------------------------------------------------------ <br />MLLD MANUFACTURER(S): Vaporless 490-37 MODEL #(s): LD2000 <br />490-38 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490-39 <br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />49040. 1 <br />MANUFACTURER(S) I -MODEL #(S) - <br />490-41 <br />---------ELLD ------------------------------------------------------------------------------- <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />490-42 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49043 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-44 <br />❑ 4. PIPE INTEGRITY TESTING 490-45 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) 490-46490-47 <br />❑ 5. VISUAL PIPE MONITORING. <br />490-48 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED- <br />490-49 <br />' Allowed for monitoring of unburied emergency enerator fuel piping only per HSC §25281.5(b)(3) <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA (23 CCR §2636(a)(3)]. <br />490-50 <br />[:1 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />490-51 <br />F]99. OTHER (Specify) <br />490-52 <br />490-53 <br />UPCF UST -D (12/2007)1/4 <br />