Laserfiche WebLink
UPCF UST -D (12/2007) 3/4 <br />IFIED PROGRAM CONSOLIDATED FORMML <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br />490-54 <br />4b <br />® 1. CONTINUOUS ELECTRONIC MONITORING ® 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify)_— <br />-------------------------------------------------------------------------------------------------------------------- <br />PANEL MANUFACTURER: ago -ss MODEL #: <br />a90-sb. <br />— — <br />490-57 ; <br />LEAK SENSOR MANUFACTURER: BEI MODEL #(S): 406 <br />490-58 <br />.DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ® b. NO <br />490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a. YES ® b. NO <br />490-60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ® b. NO <br />490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a. YES ❑ b. NO <br />490-62 <br />2. UDC CONSTRUCTION IS ®1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED <br />------------ <br />490-63 <br />IF DOUBLE WALLED: <br />490-64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1. LIQUID ❑ 2. PRESSURE [13. VACUUM <br />--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Ela. YES ❑ b. NO <br />490-64b <br />VII. PERIODIC SYSTEM TESTING <br />❑ I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />DETECTION (ELD), MUST BE PERFORMED. PERIODICELDIS PERFORMED EVERY 36 MONTHS AS REQUIRED. (23 CCR -§2644. 1 <br />___LEAK <br />Z 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66 <br />----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />ago -67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />® Alarm logs 490-68a ® Visual Inspection Records 490-68b ❑ Tank integrity testing results 490-68c <br />❑ SIR testing results (and supporting documentation records). 490-68d ❑ Tank gauging results (and supporting documentation records). 490-68e <br />❑ ATG Testing results (and supporting documentation records). 490-68f ❑ Corrosion Protection 60 -day logs 490-68g <br />❑ Equipment maintenance and calibration records. 490-68h <br />IX. TRAINING <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490-69e <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g <br />❑ OTHER (Specify): M69h, M69i <br />® This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />(ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />➢ Names of contact person(s) for emergencies and monitoring alarms. 490-70 <br />X. COMMENTS/ADDITIONAL INFORMATION= <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />Overfill Prevention: Mechanical Flappers set at 95% of tank capacity <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME Station Manager 490-72 TITLE Manager <br />490-73 <br />NAME Robert Bartel 490-74 TITLE District Manager <br />490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator <br />of any <br />conditions that need follow-up action. <br />XII.OWNER/OPERATOR SIGNATURE' <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE � 490-76 <br />DATE: <br />490-77 <br />�/ <br />10/22/08 <br />REPRE ENTING. S. Tank Ov e�erator 2. Faa it Owned. erator ❑ 3. Authorized Representative of Owner <br />APPLICANT NAME (print): 490-78 <br />APPLICANT TITLE: <br />490-79 <br />Stephen Boyd for ConocoPhillips <br />HSE Specialist <br />UPCF UST -D (12/2007) 3/4 <br />