Laserfiche WebLink
SEP "21 20 2008 <br />Issue #3: ENW, <br />• You observed liquid in the 89 piping sump, and debho� piping <br />sumps. <br />Response #3: <br />• Enclosed are the maintenance work orders showing that the water and debris <br />has been removed from the sumps. <br />Issue #4: <br />• During your inspection you were unable to locate copies of the 8/06 through 1/07 <br />or the 11/07 monthly Designated Operator Inspections. <br />Response #4: <br />• Enclosed you will find copies of the 8/06 through 12/6 Designated Operator <br />inspections. Copies of the 1/07 and 11/07 Designated Operator inspections <br />could not be located and are presumed incomplete. <br />This letter and the documents received should address the issue(s) indicated on the <br />Inspection Report. ConocoPhillips assumes that all issues regarding this report have <br />been resolved and are closed. Should you require any additional information regarding <br />this location or have any questions, please contact me at (714) 428-6572. <br />Sin <br />cerell77 <br />4�e_ren Boyd <br />HSE Specialist -U.S. Marketing <br />cc: File <br />