Laserfiche WebLink
4 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 One form par facili <br /> IYPE OF ACTION [31 NEW PLAN ® 2 CHANOE OF 1NFORMAIION sol <br /> FACILITY m# (Agency Use Only) <br /> _ r <br /> BUSINESS NAME(Sane as FACILITY NAME) <br /> ® r.t,� <br /> CR�.LCi 27 05"7 <br /> BUSINESS SITE ADDRESS -�~M 103 BUSINESS SITE CPTY 104 <br /> 1469 E Hammer Lane S-tto�y{ckto�yn, CA 21 <br /> 950 <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP) <br /> If sate to do so,facility personnel will take immediate measures to control or stop any release(e g.,activate pump shut-off,etc)and,if necessary,safely remove <br /> remaining hazardous material from the UST system <br /> Any Mean to secondary containment will be pumped or otherwise removed within a t€rac consistent with the ability of the secondary containment*sten to <br /> contain the hazardous material,but not greater than 30 csienda days,or scouter ifrequired by the local agency Recovered hazardous materials,unless still suitable <br /> for their flttetided use,will be managed as hazardous waste <br /> A Absorbent material will be used to contain ail clean up manageable spills of hazardous materials Absorbent material which has become too saturated to bre <br /> effective or which is no longer intended lot use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262 11 finds that <br /> it is non-lmzardots Used absorbent material,reusable o waste,will be stored in a properly labeled and scaled Pttntainer Waste material shall be disposed of <br /> appropriately <br /> A Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material If the water is cornaminated,it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §6626211 finds that it is nonhazardous If the water has a petroleum sheen(i a,rainbow colors),it is contaminated A thick floating petroleum layer may not <br /> necessarily display rainbow colors Water or non-h )from sumps,spill containers,etc will rot be disposed to storm wage systems <br /> A We will review secondary containatert systems for-possible deterioration if any of the following conditions occur- <br /> 1 Hazardous material in contact with secondary contalarnent is rot compatible with the material used fo•secondary containment; <br /> 2 Secondary containment is pros to damep flom any equipttcnt used to remove or dean up hazardous material collected in secondary.conaiament; <br /> 3 Hazardous material,other than the produettwaste stored in the primary containment system,is placed inside secondary containment to treat of neutralize <br /> released product/wade,and the added material of resulting material flom such a combination is not compatible with secondary containment <br /> L <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept perry i_the faulty*& <br /> - <br /> equipment is inspected at last monthly,and after earn use,supplies are replenished as needed Defective equipment is repaired or replaced as neolssary <br /> E UIPMENI NOT PERMANENTLY ON-811E,BUI'AVAILABLE POR USE iF NEEDED: fete t able _____•��_�__ <br /> EQUIPMENT LOCATION AVAILABILITY��„ <br /> R10 R20 R30 <br /> at tR21 _w_.... R31 <br /> s <br /> R12 R22 R32 <br /> 113 R33 <br /> R14 R24 134 <br /> R15 <br /> bE' k • <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE RSO <br /> Chuck J.SoRich Manger of Compliance&Maintenance <br /> NAME Ral TITLE 551 <br /> Dennis Twee_ Maintenance&Compliance Manager <br /> NAME aaa TITLE Raz <br /> NAME Ras TITLE 63 <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED E,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1 ADDFTIONALSYSTEM TESTWOOR DATA COLLW-U 2 INSPWn0X.BXQUALIFIED PERSONS ❑3 RECALIBRAIION OF EQUIPMENT RM <br /> E3 99 99 OTHER(Specify. a61 <br /> UN-022D 113 www.ou€does org Rev. <br /> i. <br />